Vehicle crane system for transporting an attachment part, in particular a main jib of a vehicle crane

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11453577
SERIAL NO

17266426

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle crane system includes a vehicle crane having a detachable attachment part, in particular a main jib, and an attachment part transporting unit which is designed to receive the attachment part when the latter is detached from the vehicle crane and comprises a mobile transporting device for transporting the attachment part. To remove and mount the attachment part of the vehicle crane and to transport it, the transporting device is equipped with at least one loading arm, the free supporting end of which is provided for at least indirect temporary coupling to an attachment part which is to be received or is already received. The loading arm is mounted pivotably on the transporting device such that an attachment part to be loaded or unloaded can be moved down onto the transporting device or from the transporting device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TADANO DEMAG GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Königstein, Klaus Martinshöhe, DE 3 3
Meissner, Klaus Zweibrücken, DE 31 273
Roth, Matthias Waldmohr, DE 34 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00