Temple assembly for spectacles and spectacles

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11372262
APP PUB NO 20210318554A1
SERIAL NO

17342009

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A temple assembly for a pair of spectacles, including a spectacle temple body, a guide member, a first temple core, a second temple core, a first pivot; and a second pivot; the second temple core is elastically connected with the spectacle temple body, the guide member is sleeved on a periphery of the first temple core, and the first temple core includes a first connecting end and a second connecting end disposed opposite to each other, the second connecting end is pivotally connected to the second temple core via the second pivot, the first connecting end is pivotally connected to a pile head of a rim or an end hinge of a spectacle temple via the first pivot; the first pivot and the second pivot are disposed perpendicular to each other; and the guide member is elastically abutted the spectacle temple body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WENZHOU WEILAN OPTICAL CO LTDWENZHOU ZHEJIANG 325000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jiang, Xindong Zhejiang, CN 5 5
Yang, Yufeng Zhejiang, CN 21 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00