Solar cell, photovoltaic module, and method for preparing the solar cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11862741
APP PUB NO 20230327032A1
SERIAL NO

18169865

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a solar cell. The solar cell includes a substrate, where the substrate has a front surface and a rear surface, the rear surface includes a textured region and a flat region, a doped surface field is formed in the textured region of the substrate; a tunneling dielectric layer, where the tunneling dielectric layer is located on the flat region; a doped conductive layer, where the doped conductive layer is located on the tunnelling dielectric layer, the doped conductive layer has doping elements, and the doped conductive layer has the same type of the doping elements with the doped surface field; a rear electrode, where a part of a bottom surface of the rear electrode is located in the doped conductive layer and the part of the bottom surface of the rear electrode is in contact with the doped surface field.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ZHEJIANG JINKO SOLAR CO., LTD.; JINKO SOLAR CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jin, Jingsheng Zhejiang, CN 27 1
Zhang, Bike Zhejiang, CN 19 1
Zhang, Xinyu Zhejiang, CN 190 307

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00