Method and apparatus for shrinking end seams around a product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9969511
SERIAL NO

14155800

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for shrinking selected spaced apart portions of film wrapped around a series of products of similar dimension being conveyed by a conveyor along a path in a selected direction is provide. The method involves the steps of: (a) indexing the conveyor and stopping the conveyor; (b) while the conveyor is stopped, causing heated fluid to flow from one or more nozzles so that a first heated fluid flow impinges upon selected portions of film in the vicinity of a product leading edge and a second heated fluid flow impinges upon selected portion of film in the vicinity of a product trailing edge; (b) repeating steps (a) and (b) multiple times so that, for multiple instances of the product, selected portions of film along both trailing and leading edges of each instance of the product are caused to shrink.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OSSID LLC; IBARAKI SEIKI CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Newell, Ernest C Rocky Mount, US 1 4
Suga, Yasutaka Ibaraki, JP 8 120

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00