Multi-layer semiconductor element package structure with surge protection function

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8520403
APP PUB NO 20110220402A1
SERIAL NO

12777596

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-layer semiconductor element package structure with surge protection function includes a substrate unit, an insulated unit, a one-way conduction unit and a protection unit. The substrate unit has at least one top substrate, at least one middle substrate and at least one bottom substrate. The insulated unit has at least one first insulated layer filled between the top substrate and the middle substrate and at least one second insulated layer filled between the middle substrate and the bottom substrate. The one-way conduction unit has a plurality of one-way conduction elements electrically disposed between the top substrate and the middle substrate and enclosed by the first insulated layer. The protection unit has at least one protection element with anti surge current or anti surge voltage function electrically disposed between the middle substrate and the bottom substrate and enclosed by the second insulated layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ZOWIE TECHNOLOGY CORP.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fang, Wei-Kuang Taipei, TW 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00