Method and systems relating to construction material assessment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11454606
APP PUB NO 20210033553A1
SERIAL NO

17012677

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Hundreds of thousands of concrete bridges, buildings etc. and hundreds of billions of tons of concrete require characterization throughout the process from manufacture to pouring and curing and on throughout service life. The characterization may relate to initial concrete properties, projected concrete properties, framework removal, corrosion, failure etc. Accordingly, a variety of measurements such as water content, electrical resistivity, and half-cell corrosion potential for example would be beneficially implemented as easy to use field test equipment or embedded sensors allowing lifetime monitoring to be performed rather than discrete assessments when issues become evident.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GIATEC SCIENTIFIC INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alizadeh, Rouhollah Nepean, CA 20 95
Ghods, Pouria Gloucester, CA 20 95
Salehi, Mustafa Nepean, CA 20 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00