High-voltage terminal assembly with integral high-voltage interlock

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8466586
APP PUB NO 20100084205A1
SERIAL NO

12244838

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle includes a high-voltage (HV) energy storage system (ESS), an HV device having HVIL source and return (SR) pins and an HV receptacle, an HV cable, and an HV terminal assembly. The assembly includes a tray portion and retainer for aligning the HV cables with the HV receptacle. An HVIL jumper device is connected to the tray portion and electrically connectable to the HVIL SR pins. The assembly includes a cover portion removably mountable to the tray portion to provide a suitable EMF shield and weather seal. The cover portion includes an HVIL shorting plug. HV electrical energy is supplied from said ESS to the HV device only when all three of the HVIL components, i.e., the HVIL SR pins, the HVIL jumper device, and the HVIL shorting plug, are electrically interconnected to form a closed HVIL circuit, while at the same time the HV cable is properly connected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GM GLOBAL TECHNOLOGY OPERATIONS LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meroz, Ryan M Rochester, US 1 24
Omell, William J Washington Township, US 4 119
Tarchinski, James E Rochester Hills, US 19 422
Van, Maanen Keith D Birmingham, US 16 268

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00