Connector assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11355884
APP PUB NO 20210194173A1
SERIAL NO

17128221

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector assembly includes a receptacle connector, a shielding cage and a partitioning element. The shielding cage has a receiving cavity. The partitioning element is provided to the receiving cavity and partitions the receiving cavity into a first module passageway and a second module passageway, the partitioning element includes a compartment frame and a grounding gasket assembled to a front end of the compartment frame, the compartment frame has a first partitioning wall and a second partitioning wall which respectively correspond to the first module passageway and the second module passageway, the grounding gasket integrally has a front plate, a first panel and a second panel, the first panel and the second panel together clamp the first partitioning wall and the second partitioning wall, the first panel and the second panel and the front plate are integrally connected by bulging portions at certain corners.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MOLEX, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yang, Che-Yuan New Taipei, TW 18 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00