Chip structure and process for forming the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8368204
APP PUB NO 20120098128A1
SERIAL NO

13277142

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chip with a metallization structure and an insulating layer with first and second openings over first and second contact points of the metallization structure, a first circuit layer connecting the first and second contact points and comprising a first trace portion, first and second via portions between the first trace portion and the first and second contact points, the first circuit layer comprising a copper layer and a first conductive layer under the copper layer and at a sidewall of the first trace portion, and a second circuit layer comprising a second trace portion with a third via portion at a bottom thereof, wherein the second circuit layer comprises another copper layer and a second conductive layer under the other copper layer and at a sidewall of the second trace portion, and a second dielectric layer comprising a portion between the first and second circuit layers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Ching-Cheng Hsinchu, TW 86 3610
Lee, Jin-Yuan Hsinchu, TW 308 15000
Lin, Mou-Shiung Hsin-Chu, TW 451 20530

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00