Power conversion controller

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11400817
APP PUB NO 20200238835A1
SERIAL NO

16752755

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A controller of an embodiment includes a limiter receiving an active current command initial value, limiting a maximum value of the active current command initial value with a predetermined value, and outputting a first value; a circuit to calculate a reactive current command initial value; a calculator to calculate a reactive current command adjustment value; a unit receiving the first value as an input, and calculating a reactive current upper limit value such that a composite value of the first value and the reactive current upper limit value is equal to or smaller than an input current maximum value; and a limiter to output the reactive current command adjustment value or the reactive current upper limit value, whichever is smaller. The predetermined value is a value to set the reactive current upper limit value to a value larger than zero and smaller than the input current maximum value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CENTRAL JAPAN RAILWAY COMPANY; TOSHIBA INFRASTRUCTURE SYSTEMS & SOLUTIONS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Hirokazu Nagoya, JP 166 2003
Kunomura, Ken Nagoya, JP 3 5
Miyajima, Hiroki Saitama, JP 30 67
Monden, Yukitaka Kawasaki, JP 26 210
Morita, Masatsugu Tokyo, JP 2 5
Sato, Kenji Nagoya, JP 531 4779
Shimizu, Toshimasa Nagoya, JP 7 23
Uchida, Toshiyuki Kiyose, JP 52 806
Yuuki, Kazuaki Tokorozawa, JP 41 541

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 2, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00