Reporting for conditional primary secondary cell addition or change

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11778527
APP PUB NO 20230007550A1
SERIAL NO

17365254

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, systems, and devices for wireless communications are described. A user equipment (UE) may receive, from a master node associated with a primary cell, a configuration for a conditional procedure for adding or changing a primary secondary cell (PSCell) associated with a secondary node. The UE may also receive, from the master node, a configuration for a handover procedure for the primary cell. The UE may transmit a report that includes information related to the conditional PSCell procedure, information related to the primary secondary cell, or both, based on a triggering order between the conditional PSCell procedure and the handover procedure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gholmieh, Aziz Del Mar, US 243 3529
Krishnan, Shankar San Diego, US 151 981
Kumar, Rajeev San Diego, US 170 540
Ozturk, Ozcan San Diego, US 566 1804
Purkayastha, Punyaslok San Diego, US 85 168
Zhu, Xipeng San Diego, US 271 1180

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00