Composite electrode material and method for manufacturing the same, composite electrode containing said composite electrode material, and Li-based battery comprising said composite electrode

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11245109
APP PUB NO 20190088937A1
SERIAL NO

15831424

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A novel composite electrode material and a method for manufacturing the same, a composite electrode containing said composite electrode material, and a Li-based battery comprising said composite electrode are disclosed. Herein, the composite electrode material of the present invention comprises: a core, wherein a material of the core is at least one selected from the group consisting of Sn, Sb, Si, Ge, and compounds thereof; and a graphene nanowall or a graphene-like carbon nanowall; wherein the graphene nanowall or the graphene-like carbon nanowall grows on a surface of the core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NATIONAL CHENG KUNG UNIVERSITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pan, Yen-Ting Tainan, TW 6 125
Tzeng, Yon-Hua Tainan, TW 14 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00