Mold-making method to gap, shim manufacturing method, manufacturing method of mold-making kit, and mold-making kit

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11919204
SERIAL NO

17295897

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method for making a mold of a gap between components, the method comprising: a step for preparing a curable composition by mixing a resin material with a curing agent that promotes curing of the resin material; a step for cooling the curable composition (M) to a predetermined temperature at which curing of the curable composition is not initiated, so as to manufacture a mold-making kit; a step for placing the mold-making kit in a gap between a first member and a second member so as to fill the gap; a step for curing the mold-making kit between the first member and the second member to mold the mold-making kit into the shape of the gap; and a step for removing the cured mold-making kit from the gap.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI HEAVY INDUSTRIES, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayashi, Noriya Tokyo, JP 25 93
Kobayashi, Yusuke Tokyo, JP 190 741

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00