Substrate processing control method, substrate processing apparatus and storage medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11862496
APP PUB NO 20210090919A1
SERIAL NO

17021373

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A substrate processing control method in a substrate processing apparatus, includes: acquiring a data set for each substrate sequentially subjected to first and second processes at first and second levels, the data set including information specifying the first level at which the first process has been performed, information specifying the second level at which the second process has been performed and information about a characteristic amount relating to characteristics of the substrate; calculating information including an expected value of the characteristic amount, and level deviations of the first and second levels to the expected value based on the data set; and correcting the first parameter at the first level or the second parameter at the second level based on the calculated information.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOKYO ELECTRON LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Konishi, Yoshitaka Hokkaido, JP 21 217
Tsuruda, Toyohisa Kumamoto, JP 26 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00