Battery charge and discharge power control in a power grid

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11916422
SERIAL NO

17419764

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to some embodiments, system and method are provided comprising determining a maximum storage capacity of an energy storage system for a time window; performing a first sort of cycles by sorting in numerical order according to a ratio of a load demand to a total available power from a power generation system at each cycle of time window; assigning a unique, charge priority to each cycle; determining, starting from a highest charge priority, a charge power for each cycle until a total charge power satisfies the maximum storage capacity; determining, starting from a lowest sorted charge priority, an available discharge power for each cycle until a total discharge power exceeds the maximum storage capacity; performing a second sort in a temporal order of the cycles; determining, starting from an earliest cycle, an available state-of-charge (SOC) and adjusting the SOC of the energy storage system for each cycle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GENERAL ELECTRIC COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yan, Min Niskayuna, US 107 1013

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00