Cooling liquid flow control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11700710
APP PUB NO 20230136588A1
SERIAL NO

17457251

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling liquid flow control device includes a heat dissipation bottom plate, a fixing holder, a cooling module, and a temperature control element. The heat dissipation bottom plate has a bottom surface configured to be in contact with a heating element on a substrate. The fixing holder is connected to the heat dissipation bottom plate and configured to be fixed with the substrate. The cooling module is connected to a top surface of the heat dissipation bottom plate to form a cavity. The cavity is configured to circulate a cooling liquid. The temperature control element is disposed in the cavity and is configured to deform based on a temperature of the cooling liquid in the cavity, thereby adjusting a flow rate of the cooling liquid in and out of the cavity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INVENTEC (PUDONG) TECHNOLOGY CORPORATION; INVENTEC CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsieh, Han Chih Taipei, TW 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00