8b/9b decoding for reducing crosstalk on a high speed parallel bus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8638241
APP PUB NO 20130266047A1
SERIAL NO

13443754

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for encoding a data word using an 8b/9b encoding scheme that eliminates two-aggressor crosstalk are disclosed. The 8b/9b encoding scheme enables a data word that can be subdivided into portions of eight bits or less to be encoded using code words having one extra bit than the corresponding portion of the data word. Each of the valid code words does not include any three consecutive bits having a logic level of logic-high (i.e., ‘1’), and represent transition vectors for consecutive symbols transmitted over the high speed parallel bus. An encoder and corresponding decoder are disclosed for implementing the 8b/9b encoding scheme. In one embodiment, the encoder/decoder implements a modified Fibonacci sequence algorithm. In another embodiment, the encoder/decoder implements a look-up table. In some embodiments, data words may be less than eight bits wide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NVIDIA CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Newcomb, Russell R Morgan Hill, US 14 292
Sudhakaran, Sunil San Francisco, US 17 191

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00