Apparatus, system and method for DC (dual connectivity)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11711736
SERIAL NO

17568779

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A UE (10) provides information on potential S′eNB(s). The information is forwarded from an MeNB (20_1) to an M′eNB (20_2) such that the M′eNB (20_2) can determine, before the handover happens, whether the M′eNB (20_2) will configure a new SeNB (S′eNB) and which S′eNB the M′eNB (20_2) will configure. In one of options, the MeNB (20_1) derives a key S′-KeNB for communication protection between the UE (10) and the S′eNB (30_1), and send the S′-KeNB to the M′eNB (20_2). In another option, the M′eNB (20_2) derives the S′-KeNB from a key KeNB* received from the MeNB (20_1). The M′eNB (20_2) sends the S′-KeNB to the S′eNB (30_1). Moreover, there are also provided several variations to perform SeNB Release, SeNB Addition, Bearer Modification and the like, in which the order and/or timing thereof can be different during the handover procedure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEC CORPORATIONTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Prasad, Anand Raghawa Tokyo, JP 144 455
Zhang, Xiaowei Tokyo, JP 177 333

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00