Apparatus and method for manufacturing electrode assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11342591
APP PUB NO 20200203774A1
SERIAL NO

16615345

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing an electrode assembly is provided. The method includes a preparation step of preparing a plurality of separators and a plurality of electrodes; an electrode unit manufacturing step of manufacturing an electrode unit having a structure in which the separators and the electrodes are alternately disposed; a pre-sealing step of forming a pre-sealing part in which at least a partial region of each separator of the plurality of separators within the electrode unit are attached to each other; and a separator cutting step of cutting a region of the pre-sealing part. An apparatus for performing the method is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG ENERGY SOLUTION, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chu, Il Un Daejeon, KR 1 0
Jeon, Su Ho Daejeon, KR 15 0
Kim, Nam Hyuck Daejeon, KR 11 0
Kim, Sang Wook Daejeon, KR 113 783
Park, Dong Hyeuk Daejeon, KR 48 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00