System for voltage level generation in a switched series/parallel sources hybrid multi-level inverter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11177743
SERIAL NO

17242499

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A single-phase hybrid multilevel inverter capable of producing a higher number of output voltage levels using fewer power switches and DC voltage sources compared to existing multilevel inverters. The levels are synthesized by switching the DC voltage sources in series/parallel combinations. An auxiliary circuit is introduced to double the number of levels by creating an intermediate step in between two levels. In addition, a zero level is introduced to overcome the inherent absence of this level in the original circuit. To improve the total harmonic distortion, a hybrid modulation technique is utilized. A 300 W, a thirteen level multilevel inverter (including the zero level) was designed and constructed. The circuit was tested with a no-load, resistive load and resistive-inductive load. The experimental results closely match simulated and mathematical analyses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KING ABDULAZIZ UNIVERSITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bassi, Hussain Mohammad Jeddah, SA 6 3
Salam, Zainal Jeddah, SA 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 16, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 16, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 16, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00