System and method for periodic beam failure measurements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11252586
APP PUB NO 20190268790A1
SERIAL NO

16410734

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for measuring beams includes determining a measurement period duration in accordance with periods of one or more periodic beam failure detection (BFD) reference signals (RSs) of a BFD RS set, wherein the BFD RSs of the one or more BFD RSs of the BFD RS set have a quasi-co-located (QCL) relationship with demodulation RSs (DMRSs) of PDCCH receptions monitored by a user equipment (UE), monitoring a subset of the one or more BFD RSs having the QCL relationship with the DMRSs of PDCCH receptions monitored by the UE that occur during a measurement period, and determining that measures of all BFD RSs in the subset of the one or more BFD RSs do not meet a specified threshold, and based thereon, reporting a beam failure (BF) instance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kwon, Young Hoon Laguna Niguel, US 240 2606
Xia, Pengfei San Diego, US 197 3412

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00