Teaching and demonstration tool for simulating fabric construction

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11302220
APP PUB NO 20210209970A1
SERIAL NO

16755470

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A teaching and demonstration tool for simulating fabric construction, which is used for demonstrating the fabric construction and assisting in teaching and designing fabric constructions. The teaching and demonstration tool includes a frame body for fixing the warp strips (6) and weft strips (7), and a plurality of pairs of positioning members (3). The frame body includes longitudinal bars (1) and latitudinal bars (2). A plurality of warp strips (6) and weft strips (7) are fixed on the longitudinal bars (1) and the latitudinal bars (2) respectively by the plurality of positioning members (3). Both the longitudinal bars and latitudinal bars (1, 2) are provided with scale lines.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JIANGNAN UNIVERSITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lu, Yuzheng Wuxi, CN 10 21
Wang, Yang Wuxi, CN 732 4838

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 12, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 12, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 12, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00