Fan-out stacked system in package (SIP) and the methods of making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9601463
SERIAL NO

14327203

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment package includes a first fan-out tier having a first device die, a molding compound extending along sidewalls of the first device die, and a through intervia (TIV) extending through the molding compound. One or more first fan-out redistribution layers (RDLs) are disposed over the first fan-out tier and bonded to the first device die. A second fan-out tier having a second device die is disposed over the one or more first fan-out RDLs. The one or more first fan-out RDLs electrically connects the first and second device dies. The TIV electrically connects the one or more first fan-out RDLs to one or more second fan-out RDLs. The package further includes a plurality of external connectors at least partially disposed in the one or more second fan-out RDLs. The plurality of external connectors are further disposed on conductive features in the one or more second fan-out RDLs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yee, Kuo-Chung Taoyuan, TW 205 2277
Yu, Chen-Hua Hsin-Chu, TW 2036 41015

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 21, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00