Outdoor lighting fixtures control systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11432390
APP PUB NO 20200323067A1
SERIAL NO

16908181

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One embodiment of the invention relates to a system for operating a plurality of streetlights in response to motion from a vehicle. The system includes a sensor associated with at least one of the streetlights and configured to detect the presence of a moving vehicle and to provide a signal representative of the moving vehicle. The system further includes a radio frequency transceiver associated with each of the streetlights. The system yet further includes processing electronics configured to receive the signal representative of the moving vehicle from the sensor and to cause the radio frequency transceiver to transmit a command to one or more of the plurality of the streetlights to change lighting states along a pathway for the vehicle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ORION ENERGY SYSTEMS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Verfuerth, Neal R Plymouth, US 115 7430

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00