Device and method for measuring condensation and/or advance of corrosion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11906418
APP PUB NO 20200300751A1
SERIAL NO

16762176

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for measuring condensation and/or advance of corrosion of a conduit includes an insulator extending around the conduit; a first conductor and a second conductor which are arranged such that at least a portion of the insulator lies between the conduit and the first conductor and the second conductor, such that the first conductor forms a first pole of a capacitor, the second conductor forms a second pole of the capacitor, and the portion therebetween comprises a capacitive coupling between the first pole and the second pole. At least one measuring instrument is configured to determine a value which is representative of the capacitive coupling.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ISENS PRO NVTECHNOLOGIELAAN 3 LEUVEN 3001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Desmet, Yves Marie-Louis Gabriel Meise, BE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 20, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00