Stateless multicasting over traffic engineered unicast tunnels

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11296983
APP PUB NO 20220094638A1
SERIAL NO

17030060

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A software defined networking (SDN) controller or routers in a network determine unicast paths from an ingress router to egress routers from the network based on quality-of-service (QoS) metrics for links between routers of the network. A subset of the unicast paths is associated with a multicast flow based on one or more QoS criteria for the multicast flow. A router pushes a label stack onto a packet of the multicast flow. The label stack includes labels that identify the subset of the unicast paths. The packet including the label stack is multicast through the network to the egress routers. Routers that receive the multicast packet selectively modify the label stack in the packet based on the labels that identify the subset of the unicast paths. The routers selectively forward the packet based on the labels.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NOKIA SOLUTIONS AND NETWORKS OY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dutta, Pranjal Kumar Sunnyvale, US 60 112

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 5, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 5, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00