Low power control of fuel cell open circuit voltage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8808934
APP PUB NO 20110171547A1
SERIAL NO

12998152

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell power plant (5) includes a stack (6) of fuel cells, each of which have an anode (9), a cathode (10), and a PEM (11) disposed between the anode and the cathode. A controller (17) recognizes an indication (67) of no load demand (68) by a load (59), to operate (45) an air recycle loop (44-46) utilizing the process air blower (35) and transfer the power output (57) of the stack from the load (59) to an auxiliary load (60), comprising a resistance which will consume a predetermined small amount of power in response to the current applied thereto, when the stack operates at a critical voltage above which fuel cell corrosion is unacceptable. Fuel and air will also be reduced (16, 40). The controller may cause increased cathode recycle when the critical voltage is reached and increased air when the voltage is a fraction of a volt below the critical voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AUDI AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Reiser, Carl A Stonington, US 89 1209
Wilson, Matthew P Groton, US 20 94
Yadha, Venkateshwarlu Dallas, US 8 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00