Dynamic connection node based computing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11183991
APP PUB NO 20190326892A1
SERIAL NO

16387794

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein are nodes, sub-systems and systems of nodes for use in a dynamic node based computer. In some embodiments, nodes include: one or more signal receivers for detecting or receiving one or more input signals from one or more signal sources, one or more signal transmitters for selectively connecting and transmitting signals to one or more other nodes; and a threshold device configured to control the selective operation of the signal transmitter based on a threshold derived from one or more characteristics of the input signals. More complex variations of the nodes include the addition of threshold manipulation devices, signal amplifiers or dampeners, control devices, or computational devices. Also described herein are machines or devices built from one or more such nodes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Stroh, Parker Wilde Hampton, AU 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 23, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 23, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 23, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00