Modular actuator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9989133
APP PUB NO 20180045285A1
SERIAL NO

15274166

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular actuator (1) includes an actuation module (10), a gear module (20) and a telescoping module (30). The actuation module (10) includes a motor (11) and a drive worm (12) driven by the motor (11). The gear module (20) includes a gearbox (21) and a deceleration gear assembly (22) disposed in the gearbox (21). The deceleration gear assembly (22) includes a deceleration worm gear (221) engaged with the drive worm (12) and includes a deceleration worm (222) driven to rotate by the deceleration worm gear (221). The telescoping module (30) includes a drive worm gear (31), a lead screw (32) driven to rotate by the drive worm gear (31), and an extendable pipe (33) threadedly connected to the lead screw (32). The drive worm gear (31) is engaged with the deceleration worm (222), and the lead screw (32) is arranged parallel to the drive worm (13).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TIMOTION TECHNOLOGY CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wu, Chou-Hsin New Taipei, TW 80 896

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00