User equipment relay procedure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11622409
APP PUB NO 20210289580A1
SERIAL NO

17196912

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects presented herein may enable a UE to notify a base station about the availability of a relay UE that is not connected to the base station. In one aspect, a first UE or a second UE transmits or receives a relay request of the first UE via sidelink, the first UE being in an RRC connected mode with a base station. The first UE or the second UE receives or transmits, via the sidelink, an indication of relay availability of a second UE in an RRC inactive mode in response to the relay request. The first UE and the second UE receive a configuration from the base station for relay of communication from the base station over the sidelink between the first UE and the second UE.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akkarakaran, Sony Poway, US 1140 3674
Awoniyi-Oteri, Olufunmilola Omolade San Diego, US 140 168
Damnjanovic, Aleksandar Del Mar, US 774 14743
Damnjanovic, Jelena Del Mar, US 564 3516
Luo, Tao San Diego, US 5002 29087
Montojo, Juan San Diego, US 1391 24452
Sakhnini, Iyab Issam San Diego, US 355 239

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 4, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 4, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00