Method for the catalytic oxidation of ammonia gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11643327
APP PUB NO 20210171348A1
SERIAL NO

16616775

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for catalytic oxidation of ammonia gas by way of an oxygen-containing gas in a presence of a noble metal-containing catalyst may be employed to give nitrogen monoxide. A temperature of an ammonia/air mixed gas may be optimized in respect of nitrogen monoxide selectivity of the reaction before contact with the catalyst. Examination of catalytic NH3 oxidation according to 4NH3+5O2→4NO+6H2O revealed that an optimum mode of operation of an NH3 burner in an HNO3 plant is not to be achieved by maintenance of a constant gauze temperature of the catalyst gauze by automatic setting of the NH3:air ratio. Rather, there is an optimum temperature for each process condition that should be set not by changing the NH3:air ratio but instead by altering the temperature of the NH3/air mixed gas before contact with the catalyst gauzes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THYSSENKRUPP INDUSTRIAL SOLUTIONS AG; THYSSENKRUPP AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Groves, Michael Gevelsberg, DE 14 124
Mathiak, Jens Castrop-Rauxel, DE 5 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 9, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00