Power amplifier

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11223327
APP PUB NO 20200412302A1
SERIAL NO

17016747

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power amplifier includes a distributor distributing an input first signal to a second signal and a third signal delayed by about 2ϕ degrees (45<ϕ<90) from the second signal, a first amplifier amplifying the second signal and outputting a fourth signal when a first-signal power level is not lower than a first level, a second amplifier amplifying the third signal and outputting a fifth signal when the first-signal power level is not lower than a second level that is greater than the first level, a first phase shifter receiving the fourth signal and outputting a sixth signal delayed by about ϕ degrees from the fourth signal, a second phase shifter receiving the fifth signal and outputting a seventh signal advanced by about ϕ degrees from the fifth signal, and a combiner combining the sixth and seventh signals and outputting an amplified signal of the first signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MURATA MANUFACTURING CO LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takenaka, Kiichiro Kyoto, JP 50 112

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 11, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 11, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 11, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00