Spectacle frame comprising electrical conductors and having a controlled foldability, method of manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11668954
APP PUB NO 20200355944A1
SERIAL NO

16762020

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A spectacle frame including a first part, at least a second part, a joining part joining the second part to the first part allowing to fold and unfold the second part relative to the first part so that the second part be movable between respective closed position and open position, at least an electrical wiring arranged through the joining part to allow an electrical connectivity between the first part and the second part, wherein the joining part is elastically deformable with curvature radius values higher than a predefined minimum curvature radius value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ESSILOR INTERNATIONAL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baillon, Loic Charenton-le-Pont, FR 2 8
Jouard, Ludovic Charenton-le-Pont, FR 21 50
Reignault, Marc Charenton-le-Pont, FR 12 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00