Hybrid energy conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9496445
APP PUB NO 20130257156A1
SERIAL NO

13876162

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A piezoelectric-photovoltaic hybrid structure is described, having a plurality of superposed layers including a photovoltaic layer and a piezoelectric substrate. A method of forming such a structure is also described, including the steps of providing a piezoelectric substrate and superposing a photovoltaic layer over the substrate. A power conversion system is described, comprising such a hybrid structure with a first circuit connected to the piezoelectric substrate and a second circuit connected to the photovoltaic layer. Also discussed is a method of generating, storing, distributing, or consuming electrical energy, involving the use of such a system in connection with a distribution circuit or network, electrical load, or energy storage device. A further power conversion system is described where the piezoelectric and photovoltaic circuits are connected to a single, or a respective, DC-DC converter. A set of such power conversion systems may be connected in series at their output terminals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UNIVERSITY OF BOLTON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hadimani, Magundappa L (Ravi) Bolton, GB 2 8
Prekas, Kleanthis Ilion, GR 1 6
Siores, Elias Manchester, GB 2 8
Vatansever, Derman Muratli, TR 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00