Recoating assembly for an additive manufacturing machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11458681
APP PUB NO 20200238613A1
SERIAL NO

16261936

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An additive manufacturing machine includes a build platform being movable along a build direction and a powder supply assembly for dispensing additive powder above a build plane. A recoating assembly is used for spreading the additive powder into a build layer on the powder bed. The recoating assembly includes a support beam that slidably supports a recoater blade and moves along a recoater direction over the powder bed. A blade positioning mechanism adjusts the vertical position of the recoater blade in response to measurements from a sensing device which measures a tip clearance between the recoater blade and the build plane. The tip clearance may be measured along the length of the recoater blade while stationary and while moving along the recoater direction to obtain a smooth and level layer of additive powder.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GENERAL ELECTRIC COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shi, Jinjie Mason, US 33 63
Worthing,, Jr Richard Roy Liberty Township, US 15 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 4, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00