Thrust reverser actuation arrangement and deployable fairing systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11873782
APP PUB NO 20230003175A1
SERIAL NO

17720519

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for deploying a thrust reverser includes translating a carrier along a track, transferring a first load between the carrier and a first reverser door in response to the carrier translating along the track, rotating the first reverser door between a closed position and an open position in response to the carrier translating along the track, transferring a second load between the carrier and a deployable fairing in response to the carrier translating along the track, and rotating the deployable fairing between a stowed position and a deployed position in response to the carrier translating along the track.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROHR INC850 LAGOON DRIVE CHULA VISTA CA 91910-2098

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ghandour, Imad D San Diego, US 9 6
Gormley, Timothy Bonita, US 71 196

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00