Bracket

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11767771
APP PUB NO 20210140346A1
SERIAL NO

17090957

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bracket for mounting a first component to a second component, the bracket comprising at least one mounting boss defining a through-hole having an opening axis in axial direction for receiving a fixing used to attach the bracket to one of the first and second components; wherein the mounting boss comprises a fixing support face around the through-hole on a surface of the bracket, the fixing support face configured to bear a head of the fixing; the mounting boss is configured to resist compressive forces exerted on the bracket by the head of the fixing; and the mounting boss comprises a cavity in a space projected from the fixing support face in the axial direction of the through-hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROLLS-ROYCE PLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ball, Andrea L Derby, GB 2 1
Taylor-Tibbott, Oliver C Lichfield, GB 9 17
Thar, Jaideep Y Derby, GB 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00