Methods for forming interconnection structures in an integrated cluster system for semicondcutor applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9508561
APP PUB NO 20150262869A1
SERIAL NO

14276879

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the present invention provide methods for forming an interconnection structure in semiconductor devices without breaking vacuum with minimum oxidation/atmosphere exposure. In one embodiment, a method for forming an interconnection structure for semiconductor devices includes supplying a barrier layer etching gas mixture into a first processing chamber having a substrate disposed therein to etch portions of a barrier layer exposed by a patterned metal layer until the underlying substrate is exposed, the first processing chamber disposed in a processing system, and forming a liner layer on the substrate covering the etched barrier layer in a second processing chamber disposed in the processing system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • APPLIED MATERIALS, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koshizawa, Takehito San Jose, US 28 418
Naik, Mehul B San Jose, US 56 1177
Nemani, Srinivas D Sunnyvale, US 252 11601
Ren, He San Jose, US 77 1632

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00