Two-stage compression refrigeration cycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10337766
APP PUB NO 20180209696A1
SERIAL NO

15744008

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A two-stage pressurizing refrigeration cycle is provide with a suction-side guiding portion in a part of a low-stage side suction pipe that leads from a bypass branch portion, at which a bypass pipe is branched, to a refrigerant suction side of a low-stage compressor. The suction-side guiding portion guides a lubricating oil from the refrigerant suction side of the low-stage side compressor to a side of the bypass branch portion. The suction-side guiding portion is located at a position in a vertical direction that is equal to or higher than apposition in the vertical direction of the bypass branch portion, and a part of the suction-side guiding portion on the refrigerant suction side of the low-stage side compressor is located at a higher position in the vertical direction than a part of the suction-side guiding portion on the side of the bypass branch portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DENSO CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takizawa, Ryo Kariya, JP 9 131

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00