Secondary battery, method of manufacturing the same, and method of manufacturing conductive member for the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11342618
APP PUB NO 20210305647A1
SERIAL NO

16334470

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A secondary battery including an electrode body including a positive electrode plate and a negative electrode plate; an exterior body that has an opening and houses the electrode body; a sealing body that seals the opening; a terminal that is provided in the sealing body, and connected to the positive electrode plate or the negative electrode plate; and a conductive member that is disposed on an outer side of the sealing body, and is connected to the terminal. The conductive member has an overlap section in which one end of a conductive plate-shaped member is folded and opposed surfaces are overlaid on other, and a base section in which no surfaces are overlaid on other, and the terminal is connected to the conductive member in the base portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SANYO ELECTRIC CO., LTD.; PANASONIC HOLDINGS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashimoto, Eiji Hyogo, JP 55 790
Wakimoto, Ryoichi Hyogo, JP 97 85

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00