Charging socket and lead frame assembly and charging socket

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11777260
APP PUB NO 20220385001A1
SERIAL NO

17749212

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses a charging socket lead frame assembly and a charging socket. The charging socket lead frame assembly has a lead frame which has a frame body and an electrical connection structure arranged in the frame body. The lead frame is adapted to be installed in a cavity of a charging socket, and a plurality of terminals of the charging socket are adapted to pass through the frame body. One end of the electrical connection structure is exposed from the frame body to electrically connect with a lead of a temperature sensor. The lead frame is arranged in non-electrical contact with at least one signal terminal of the charging socket. Therefore, the structure of the lead frame can be simplified and the manufacturing difficulty and cost can be reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TYCO ELECTRONICS (SHANGHAI) CO., LTD.; TYCO ELECTRONICS (SUZHOU) LTD.; TYCO ELECTRONICS TECHNOLOGY (SIP) LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dou, Renyi Suzhou, CN 1 0
Jiang, Kaixuan Shanghai, CN 4 0
Wang, Jinshun Suzhou, CN 2 2
Zhu, Fangyue Shanghai, CN 8 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00