Optimization of ply orientations for multi-layer composite parts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10467350
APP PUB NO 20170228473A1
SERIAL NO

15018075

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are provided for composite part design. One embodiment is an apparatus that designs a composite part. The apparatus includes a controller configured to generate a design for the part. The controller subdivides the part into blocks that each comprise a contiguous stack of layers within the part, identifies rules that constrain how layers that have different fiber orientations are stacked within the part, generates a guide for a block that prescribes a fiber orientation for each layer of the block, and identifies sublaminates comprising that are compatible with the guide for the block. The controller subdivides the part into panels, and selects one of the compatible sublaminates for one of the panels of the block, based on compatible sublaminates for neighboring panels.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE BOEING COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blom, Adriana Willempje Shoreline, US 15 109
Kang, Laura Sumi Seattle, US 4 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00