Aseptic filling apparatus and method of decontaminating the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11186474
SERIAL NO

16607777

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of decontaminating an aseptic filling apparatus that includes stations including a content filling station arranged from an upstream side to a downstream side of a flow of a preform or container, and each of the stations is covered by a chamber. The method includes sterilizing the content filling station by performing a CIP and then an SIP or performing an SIP serving also as a CIP of the content filling station, removing a cleaning liquid used in the CIP or SIP, and performing a COP and/or an SOP of the various kinds of stations in a predetermined order. A first SOP using a first sterilizer and a second SOP using a second sterilizer are performed stepwise on the various kinds of stations while the CIP and the SIP or the SIP serving also as the CIP are being performed on the content filling station.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DAI NIPPON PRINTING CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayakawa, Atsushi Tokyo, JP 147 968
Tamagawa, Ryuichi Tokyo, JP 9 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00