Downlink control channel structure for low latency communications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10892928
APP PUB NO 20180324018A1
SERIAL NO

15953878

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, systems, and devices for wireless communication are described. In some aspects, a user equipment (UE) may identify a resource block set that includes a data region and a control region, wherein the resource block set spans a portion of a system bandwidth in a shortened transmission time interval (sTTI), wherein the sTTI includes three symbols, wherein the control region occupies the three symbols and includes control information for the UE for the sTTI, and wherein the control region and the data region are frequency division multiplexed. The UE may obtain content in the sTTI based at least in part on the control information. Numerous other aspects are provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALCOMM INCORPORATED5775 MOREHOUSE DRIVE SAN DIEGO CA 92121-1714

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Wanshi San Diego, US 2627 31419
Hosseini, Seyedkianoush San Diego, US 876 2116
Patel, Shimman Arvind San Diego, US 197 2109

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 12, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 12, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 12, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00