Dual-fuel multi-port connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11493161
APP PUB NO 20200124285A1
SERIAL NO

16605896

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An example connector includes: a block having a plurality of through-holes; a clamp plate having a plurality of through-holes aligned with the plurality of through-holes of the block; and a plurality of fittings, each fitting having a first end inserted through a respective through-hole in the clamp plate to be received within a corresponding through-hole in the block. Each fitting has a second end opposite the first end and configured to couple to a tube. Each fitting has grooves for mounting a radial seal and a retaining ring. The retaining ring is disposed between the clamp plate and the block.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PARKER INTANGIBLES LLC6035 PARKLAND BOULEVARD CLEVELAND OH 44124-4141

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ameser, Anna Columbus, US 1 1
Amling, Theodore Columbus, US 1 1
Schupska, Peter Cleveland Heights, US 6 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00