NOx sensor element and NOx sensor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11549925
APP PUB NO 20200319156A1
SERIAL NO

16834299

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A NOx sensor element includes: a first pump cell configured to adjust an oxygen concentration in a first measurement chamber; a diffusion resistance portion configured to adjust a diffusion rate of a measurement target gas introduced into the first measurement chamber; and a second pump cell in which a pump current corresponding to a NOx concentration in the measurement target gas after the adjustment of the oxygen concentration, flows. The first pump cell includes: a first solid electrolyte; an inner pump electrode containing a noble metal, and exposed to the first measurement chamber; and an outer pump electrode containing a noble metal, and disposed outside the first measurement chamber. The outer pump electrode contains not less than 22% by mass of a main component of the first solid electrolyte.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NGK SPARK PLUG CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furuta, Hitoshi Nagoya, JP 47 185
Kamada, Kentaro Nagoya, JP 54 194

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 10, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00