Elastomeric cell frame for fuel cell, method of manufacturing same, and unit cell having same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11024866
APP PUB NO 20200194816A1
SERIAL NO

16670951

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An elastomeric cell frame forming a unit cell of a fuel cell stack may include an insert in which a membrane electrode assembly and a pair of gas diffusion layers are bonded to each other; and an elastomeric frame disposed to surround a periphery of side surfaces of the insert, in which the side surfaces of the insert are positioned between the upper and lower surfaces of the insert, one of upper and lower surfaces of the insert and side surfaces of the insert and bonded with the periphery of the surface of the insert and the side surfaces of the insert into an integrated structure by thermal bonding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYUNDAI MOTOR COMPANY; KIA MOTORS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heo, Seong Il Yongin-Si, KR 28 23
Jeong, Byeong-Heon Yongin-Si, KR 40 58
Yoo, Jin Hyeok Cheonan-Si, KR 18 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 1, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00