Defibrillation catheter system, defibrillation power supply device and method for controlling defibrillation power supply device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11679269
APP PUB NO 20200360705A1
SERIAL NO

16986591

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a defibrillation catheter system, a defibrillation power supply device, and a method for controlling the device during observation of intracardiac potential and defibrillation. A defibrillation catheter system 1 includes a catheter 20; a first power supply part 6A and a second power supply part 6B connected to the catheter 20; and an electrocardiograph 40 measuring an intracardiac potential, wherein the catheter 20 is provided with a first electrode group 21 having at least a 1-1 electrode and a 1-2 electrode and a second electrode group 22 having at least a 2-1 electrode and a 2-2 electrode, the first and second electrode groups 21 and 22 are connected to the electrocardiograph 40, the 1-1 electrode and the 2-1 electrode are connected to the first power supply part 6A, and the 1-2 electrode and the 2-2 electrode are connected to the second power supply part 6B.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KANEKA CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sakamoto, Shinichiro Settsu, JP 23 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00