Pipe tubular reinforcement forming machine, and related method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11712726
APP PUB NO 20200398325A1
SERIAL NO

16956628

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A machine that includes a first feeder, able to unwind a first tape; a profiler comprising an upstream profiling stage able to profile the first tape to form a pre-profiled first tape; a second feeder, able to unwind a second tape, the second tape being a flat tape. A profiler that includes an intermediate joining stage able to receive the second tape as a flat tape from the second feeder and able to join the pre-formed first tape and the flat second tape; and at least a downstream profiling stage configured to jointly profile the first tape and the second tape received from the intermediate joining stage and form a combined profiled strip.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TECHNIP N-POWER

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alves, Onoraldo Soares Espirito Santo, BR 1 0
Polez, Luiz Gustavo Espirito Santo, BR 1 0
Stikan, Rafael Pacheco Espirito Santo, BR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 1, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00