Dirt pick up resistant latex resin

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11945967
SERIAL NO

16919686

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a benzophenone-containing emulsion is provided. The method includes a step of forming a pre-emulsion by combining a monomer composition with a benzophenone or a benzophenone derivative in water, the monomer composition including one or more monomers selected from the group consisting of (meth)acrylic acid monomers and (meth)acrylic monomers, vinyl acetate, aromatic monomers, vinyl neodecanoate, and combinations thereof. The pre-emulsion is polymerized by combining the pre-emulsion with a radical initiator in a reactor to form a reaction mixture that polymerizes to form an emulsion polymer. This procedure implements novel and easily polymerizable benzophenone (meth)acrylates) into the polymer backbone preventing them from leaching out of finished coatings. Advantageously, the benzophenone-containing emulsions can be used to form paint coatings with dirt pick-up resistance while maintaining the excellent flexibility of paint finishes to limit cracking of the final film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BEHR PROCESS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hicken, Ryan Tustin, US 3 0
Li, Jigui Irvine, US 12 44
Ziehm, Christopher Costa Mesa, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00